cancel
Showing results for 
Search instead for 
Did you mean: 

Integrating Fieldglass Approved Timesheets with SAP ECC CATS

former_member551371
Discoverer
0 Kudos
837

I am looking for any best practices / lessons learned / reference architecture / any other helpful material that describes how Fieldglass approved timesheets can be integrated with SAP ECC CATS. I want to pass FG approved timesheets into CATS.

Accepted Solutions (0)

Answers (1)

Answers (1)

JutVil
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hi Robert

If you access this link: https://help.sap.com/docs/SAP_FIELDGLASS_INTEGRATION?task=all_tasks you are able to see the connector library. Within the library, you can find the CATS connector with a very valuable description.

I hope that helps,

Jutta