on 2012 Jan 24 10:35 AM
Hi All,
I am facing issue with the field posting date/document date in header data-basic data-document date. The time zone of the user is CST. If the user has created the purchaser order say at 10 PM on 23 January, the document date in the Purchase order will be displayed as 24 January as per UTC time instead of 23rd January as per the time zone CST in user settings.
This is not correct and creates confusion. We are using SRM 5 version/ Could anyone help me out how to resolve this issue?
Thanks & Regards,
Gayatrhi
Edited by: gayu_march on Jan 24, 2012 11:36 AM
Request clarification before answering.
Hi,
Please check your time zone settings under STZAC tcode.
Regards,
Nikhil
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Nikhil,
Thanks for your reply.
The PO creation and changed time are correct as per the US time zone. So there is no issue with the server settings. Even the description of the PO (which has date and time) shows the correct date. The only field which has issue is the document date/posting date.
Regards,
Gayathri.