cancel
Showing results for 
Search instead for 
Did you mean: 

How to STOP replication of material master from R/3 to SRM

former_member182464
Participant
0 Kudos
118

Hello Team,

We need to stop replication of material master from R/3 to SRM. I have read below set up link but I am not sure what needs to be done to Remove these setting or there any easier way

Thanks,

Darshak

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Darshak,

Make the material number range filters "Inactive" in the transaction R3AC1 by flagging the check-box which would stop the material number replication.

Br,

Raghu

former_member182464
Participant
0 Kudos

Hi Raghu,

If we mark Number range inactive. Do we still get failed entry in SM58 in inbound (SRM) and Outbound (PRD) ?

That's the main reason for now that we have to delete inbound and outbound queue

Thanks,

Darshak

Former Member
0 Kudos

Yeah, if all the filters are made inactive, replication would stop completely.

Also, I'd expect the queues to be blocked in SMQ1 (ECC) & SMQ2 (SRM)  trnasactions and not in SM58.

Check your outbound in ECC and inbound in SRM and let me know fi that helps.

Br,

Raghu

former_member182464
Participant
0 Kudos

Hello Raghu,

Thanks for you help. After deactivating filters, SMQ1 and SMQ2 entries are stopped.

Thanks,

Darshak

Answers (0)