I Cannot Force MRP for the Material on Single item Single Material Planing Transection, as the Material is Blocked.

Accepted Solutions (0)

Answers (1)

Answers (1)

kundan1981
Active Participant
0 Kudos

Hi Bobby,

Check if you have maintained any plant specific materiel status either in purchasing or MRP 1 (General data) view of the material master.Remove the status and try MRP run again.