cancel
Showing results for 
Search instead for 
Did you mean: 
Read only

How to change the BP number of the user

ameena
Newcomer
0 Likes
362


Hi,

In the SRM System, SC is created with a requester XYZ and BP 1234. Later the User assigned was changed in the Organization structure as a result new BP 2345 was created for the user XYZ. Now how to replace the new BP with Old BP number?

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Likes

Hi. I have a feeling there may be something in SRM 7 EHP 3 to assign docs from 1 BP to another also.

Regards,
Dave.

ivy_li
Product and Topic Expert
Product and Topic Expert
0 Likes

Hi,

Please user Report Z_CHANGE_PGUID_002--SRM5.0

                                Or

                                Z_CHANGE_PGUID_003--SRM7.0 and above

attached in notes 1507030 & 1706323

to replace corrupted BP in open documents

Best regards,

Ivy

Former Member
0 Likes

HI ,

In Order to Change the BP number in existing created SC and also in order to display those sc in worklist of new user. You need to create custom Abap program.there is no standard.program or function module for this.,

Regards,

Sanjeev.