on 2010 Dec 01 4:33 PM
Hi All,
Can we configure external requirement (plan driven procurement) with out PI/XI on ECC 6.0 and EHP4.
Because I read the configuration guide it's not clear. Still sap support old method like configure profile on table V_T160PR,V_T160EX .
Thanks
Request clarification before answering.
Hi Laasya,
I am working on ECC 6.0 (Ehp 4). I dont think it is possible to configure 'Plan Driven Procurement' without using XI/PI.
We use the standard scenario i.e. 'Plan driven procurement with Supplier Enablement'
Regards,
Nikhil