on ‎2013 Jun 11 9:24 PM
Hi experts,
We're trying to emend the systems and we came out with this problem. Does anybody know where is the option/steps to "ENABLE" the integration system ?
We already did everything on the "integration guide", both in PI and Sourcing steps.
This is the error that appears:
# Failed: object 4: ID: The record is ignored because ERP or SRM integration system is not enabled. Ask your system administrator to enable it.
Thanks in advance and I'll wait for responses.
R. Navajas
Request clarification before answering.
Besides I'm not integrating the system to the SRM, just the ECC... I had to set "TRUE" to the ""is_srmint_installed", which solved my problem.
Thanks Parankush
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
'is_srmint_installed' need not be maintained if only ECC integration is needed. If it is indeed working this way then it is a bug. Did you check to see if your cache was refreshed after you changed the 'is_sapint_installed'. It could be that your cache was not refreshed as yet and setting 'is_srmint_installed' was a co-incidence...
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.