cancel
Showing results for 
Search instead for 
Did you mean: 
Read only

DNL_CUST_PROD0 signification

Former Member
0 Likes
468

Hello

What is the use of DNL_CUST_PROD0, Material no conversations. What conversations are they?

what will happen if this object is not loaded prior to object MATERIAL.

Please reply guys. I will assure u the points.

Thanks in advance.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Likes

Hi Santosh,

DNL_CUST_PROD0 is basically used for converting the ERP material number to the product ID in SRM

DNL_CUST_PROD0 will thus ensure that the length of the product ID in the ERP database is maintained in SRM too.

Regards,

Nikhil

Former Member
0 Likes

Hello Nikhil

Could you please tell me the impact, if this object is not executed before object MATERIAL.

Regards

Imran

Former Member
0 Likes

Hi Imran,

If you don't execute this before MATERIAL object then there will be inconsistencies in the length of your ECC material number transferred in SRM.

We maintain product lengths using COMCPRFORMAT.

Regards,

Nikhil

Answers (0)