Different *process level schemas* for different line items of a single PO.

Former Member
0 Likes
136

Hi,

We are using Process Controled workflow for PO in SRM-7.0

Here i have a question like, can we assign different process level schemas for different line items of a single PO.

For example in one order i have 2 items so can i assign 2 process level schemas like 1 item may require 2 levels approval based on cost center(SCHEMA1) and other line item may require Spending limit approval(SCHEMA2)?

If yes then how we can acheive this as in my BRF Process Schema Evalution i am not able to pass process level schema names based on the line item. I m not sure if we can do it here.

In other way for example :

Depending on category and item value the SC item has to be approved..

I've created an event which finds a Z-process schema via FM.

In the FM Is it possible to use different process schemas for items?

When yes how can I set the schema e.g.

item 10 schema1

item 20 schema2

item 30 schema3

item 40 schema4

Thanks!

Edited by: shyamsundar sahu on Dec 13, 2011 4:23 AM

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Likes

Hello,

Could you get solution to this?

We are on SRM702 and have similar requirement.

Need help urgently with evaluations at item levels.