on 2011 Dec 12 3:51 PM
Hi,
We are using Process Controled workflow for PO in SRM-7.0
Here i have a question like, can we assign different process level schemas for different line items of a single PO.
For example in one order i have 2 items so can i assign 2 process level schemas like 1 item may require 2 levels approval based on cost center(SCHEMA1) and other line item may require Spending limit approval(SCHEMA2)?
If yes then how we can acheive this as in my BRF Process Schema Evalution i am not able to pass process level schema names based on the line item. I m not sure if we can do it here.
In other way for example :
Depending on category and item value the SC item has to be approved..
I've created an event which finds a Z-process schema via FM.
In the FM Is it possible to use different process schemas for items?
When yes how can I set the schema e.g.
item 10 schema1
item 20 schema2
item 30 schema3
item 40 schema4
Thanks!
Edited by: shyamsundar sahu on Dec 13, 2011 4:23 AM
Request clarification before answering.
Hello,
Could you get solution to this?
We are on SRM702 and have similar requirement.
Need help urgently with evaluations at item levels.