on 2010 Dec 15 6:36 AM
Hi,
The confirmation was transmitted to backend system and successfully GR created. But in SRM status is still showing as above subject.
The below was the status in BBP_PD
HEADER I1015 Awaiting Approval
HEADER I1017 Currently Being Transferred
HEADER I1018 Transmit to Backend System (this has to be changed)
HEADER I1021 Created
HEADER I1022 Approved
HEADER I1038 Complete
HEADER I1044 Confirmed
Can any one plz let me know how to change the status. I have tried to update the status through CRM_STATUS_UPDATE but as i was new to this, no idea wat to give to change the status.
So please guide me how to chnage the status.
Regards
Pratap J
Request clarification before answering.
Hi Pratap,
Try to delete this document in table BBP_DOCUMENT_TAB table in SRM. Then run the CLEAN_REQREQ_UP and BBP_GET_STATUS report.
cheers,
Akash