on 2012 Jul 02 1:12 AM
Hi
I am using IDES(SRM 7.00 withou EHP1) and trying to understand the configuration behind Classic PO.
I have deactivated extended classic scenario and sourcing is not carried out for Product category.PI is not enabled .
I think i have done the necessary configuration required for generating Classic PO and the PO also got generated but i am not able to edit the PO in Backend due to which i am assuming that this PO got transferred from the SRM as the backend PO is not a leading PO
So how can i be sure that the PO which appears in backend is created from Classic scenario and not extended classic scenario.I am not able to edit this PO in backend as i get the message that " BBP Purchase order cannot be changed".
Is the value of field STATU in table EKKO different for PO created from Classic/extended classic scenario.
Thanks
Request clarification before answering.
Hi,
While checking in related documents if the scenario is CS you will just see PO Backend Document Number.
Regards,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
the easiest way to find out, which follow-on documents have been created is to check the "Related Documents" tab of the Shopping Cart on the UI ("Document Number" and "Backend Document Number") or the Header/Item links with tc. BBP_PD.
Regards,
Timea
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.