cancel
Showing results for 
Search instead for 
Did you mean: 
Read only

Central Contract. Doubt with Status: In renewal

Former Member
0 Likes
242

Hi everyone,


I'm working in a new implementation of SRM 7.01 in extended classic scenario.


We create contracts directly in Contract Managment and we have the following process:


•User creates a contract (Contract A),  save and release. The new status is: released.  There is not approval WF. 


•Through the button: Renew, the system creates a new RFX and the Contract has a new status: In renewal


•In SoCo we create RFx Response and then we accepted one of them


•Finally,  We create a new Contract, through the button: Create Contract for this Response  in the Rfx Response . And the system creates new one (Contract B).

The doubt is if we have a new contract (Contract B) and this contract was assigned to previous RFX and previous Contract (Contract A), Why Does is the status of contract:A still in Renewal? The system should change the status of contract:A  to Completed or something like this?


The user requested that the previous contract has status completed or something similar if we have created a new contract in the RFx Response. Is this possible?

Thanks in advance.

View Entire Topic
Former Member
0 Likes
Former Member
0 Likes

Thanks Julian,

I  had seen that link before, but it was not clear for me.

Tania