unable to save EC50E

Former Member
0 Kudos
210

Hi,

after entering contracts data n general data in EC50E, when I clicked on Save button.

It is not saved and continuing with processing.

wt's the issue?

rgds

harish

1 ACCEPTED SOLUTION

Former Member
0 Kudos
144

HI

is ur system a fresh system ...r u performing it for the 1st time??

if so concult ur basis consultants for this issue

kr

raj

View solution in original post

2 REPLIES 2

Former Member
0 Kudos
145

HI

is ur system a fresh system ...r u performing it for the 1st time??

if so concult ur basis consultants for this issue

kr

raj

Former Member
0 Kudos
144

Hi,

To perform Move-in EC50E, at the minimum you need BP or CA and premise or installation, providing Move-in date. This data should be enough to perform Move-in.

Now there are numerous validation that take place during move process, this could be due to mostly configurations or custom code or functional error.

If you could let us know what exact error/message you are getting then we probably can be more helpful.

-ASB