2013 Oct 03 6:48 AM
Hello,
I have defined 3 dunning level for a dunning procedure.
However, there are condition in them we have to skip a level and go directly to the next dunnung level.
How can I do it ? Can I use new dunning level field ?
Thanks
2013 Oct 26 11:05 AM
Hi Yair,
If you want to skip one dunning level, you can do it manually in SAP, using transaction FPM3.
1. Go to FPM3 transaction.
2. Give BP/CA number.
3. Click on Change.
4. Change to the new dunning level as required.
Hope this Helps..!!
Thanks
Vipin KV
2013 Oct 03 11:31 AM
Update T_FKKMAZE-MAHNN (New dunning level) to 3 during activities of 1st dunning level.
Thanks.
2013 Oct 26 11:05 AM
Hi Yair,
If you want to skip one dunning level, you can do it manually in SAP, using transaction FPM3.
1. Go to FPM3 transaction.
2. Give BP/CA number.
3. Click on Change.
4. Change to the new dunning level as required.
Hope this Helps..!!
Thanks
Vipin KV
2013 Oct 26 4:34 PM
Hi Yair,
This can be done through the FQ-events which are called through FPM3 . Here based on your condition or logic we can override the dunning level to next level.
Please let me know if you require more info.
thanks,
Suganth