2012 May 28 12:46 PM
Hi,
Could be please tell me how to configure main and sub meter process in sap.
Regards.
Priya
2012 May 28 1:19 PM
2012 May 28 1:24 PM
Actually i want to install a meter as a main meter and for this main meter i want to install 4 sub meter
and main meter will have all sub meters readings and billing would be created on this main meter.
apart from this main meter, billing should be done seprately on sub meters.
How can i configure it in sap.
And please let you know about serial swiching ( with register relationships)
2012 May 28 2:12 PM
Hi Priya,
Please find below the required solution for Prime -Sub Design
Assumption:Prime and sub in Different Sites
A)Prime installation
1) Prime Meter Full Installed on the Prime Installtion(Billable)
2) 4 Sub Meters Billing Related Installed on the Prime Installation(Non-Billable).
B)Sub Installations
1)All the 4 sub meters would be full Installed on theirs Respective Sub Installations i,e each sub meter would be full installed on their respective Installations(Billable)
C)Register Relationship
1)Prime Meter and the 4 Sub meter would have a Register Relationship set between each other(Serial Switching)
D)Meter Point Reference No:(MPRN/MPAN)
1)Technical Allocation of the Prime Meter on the Parent MPRN Sub meter on the Sub MPRN.link them through Parent MPRN field in EEDM10.
Now after this set up .Bill the Sub Installations first and then the Prime Installation.
Regards,
Pawan