2011 Jun 30 3:02 PM
Hi Experts,
I want to ask that is it possible for us to move in a contract in past date?
Like if i want to do move in for 1 June 2011 today then will i be able to do that ??
Regards.
2011 Jun 30 3:13 PM
Yes - as long as the installation is not already allocated at that date, and if it exists as of that date. You will also need to ensure it can bill as of that date (rate determination as well as device installation)
regards,
bill.
2011 Jul 06 10:31 AM
Hi Kumar,
Yes, you can change the MVI of the contract to the past date.
Initially it will take the future date, after saving the contract, the contract goes to the hold, if the security deposit is not paid. Then you can change the MVI date to the past and you can make the contract as SD Paid.