Hi,

While creating a movein is the field PORTION in the database table EVER getting updated?

If yes then in what all scenarios?

I have been creating contracts but in none of the scenario this field is getting populated. Do we need to do some configuration changes for the same.

Thanks

Himansu Roy

1 ACCEPTED SOLUTION

Former Member
0 Kudos
257

Hello,

This is an Alternative Portion field.

This is a specific case .If u want to override the MRU generated dates ,then by selecting this field manually u can override the MRU dates.

U can bill that contract with manually given portion dates.

Regards,

Narendar Konakanchi

View solution in original post

7 REPLIES 7

Former Member
0 Kudos
257

hi

no its not gettting populated..

kr

prince

Former Member
0 Kudos
258

Hello,

This is an Alternative Portion field.

This is a specific case .If u want to override the MRU generated dates ,then by selecting this field manually u can override the MRU dates.

U can bill that contract with manually given portion dates.

Regards,

Narendar Konakanchi

Former Member
0 Kudos
257

Hi,

PORTION in EVER table is actually alternative portion, used to over ride the portion assigned to MRU, which is further assigned to the installation for which the contact is created. MRU and Portion are used for meter reading schedules (Ex: MRU = Bombay and portion = Mulund). However if you want to over the meter reading schedule(also billing) for a contract then you can populate this PORTION field in EVER table.

I think there is isn't any configuration for this and it has to be populated manually.

-ASB

0 Kudos
257

Any suggested method using which I can update the alternate portion field in the EVER table while I am doing movein.

Former Member
0 Kudos
257

Any specific enhancement required to do the same?

0 Kudos
257

Unfortunately at top of my head I dont know recollect enhancement.(there is enhacement to set default values on contract, just search). However if you already have some development post move process than you can simply implment in their.

-ASB

Former Member
0 Kudos
257

Thank you folks for the valuable responses.