Hi ,

I am getting a error of "Extrapolation is in-consistence for equipment #### and reg ## ,while creating payment scheme through EA61PS.

Can anyone please suggest me where the issue might be ?

Thanks,

Bighnajit 

1 REPLY 1

AmlanBanerjee
Active Contributor
0 Kudos
130

Hi Bighnajit,

The error that you are getting is triggered from a standard include program and can be because of the following reasons-

(a)Too less Quantity-

     -Meter reading had an overflow, but the previous reading had none.

    - No overflow in previous reading and current reading is still higher than previous.No over flow gets billed.

(b) Both readings had an overflow and current reading is lower than previous reading. (Normally this doesn't happen).


(c) The current reading has no overflow, the previous reading has an overflow,but after the correction the current reading is lower than the previous. This is  inconsistent, because the previous reading can't be estimated the current reading.

Check SAP Note 920277 for more information on the same.

Also check SAP Note 909301 and 1895896 if you are having any of these scenarios...