Parallel meter reading upload via RFC user got TIME_OUT

0 Likes
501

Hi,

I got ERROR during MASS meter reading upload (Time limit exceeded.)

In the source code you have the termination point in line 76 of the (Include) program "LEL47U01".

Termination occurred in the ABAP program "SAPLEL47" - in "ISU_DB_ETRG_UPDATE". The main program was "SAPMSSY1 ".

The program "SAPLEL47" has exceeded the maximum permitted runtime without interruption and has therefore been terminated.

Regards,

Mukesh

1 REPLY 1
Read only

william_eastman
Product and Topic Expert
Product and Topic Expert
0 Likes
371

What are your technical parameters? How much data is being uploaded? How is RFC relevant here?