Hi All,

My Client's requirement for holiday on scheduled meter reading date is as follows:

If the Scheduled MRD is on Holiday then it must be shifted to the following working day ie Correct Non Working day of MRU must be set to '1'.

SAP has two options :

1 stands for Use the workday following the non-workday

2 stands for Use the workday prior to the non-workday

I am unable to set this value to 1, it is always showing me "Enter 2 in Corr. Holiday field". Incase i am manually entering the value as 1 it is showing as

Value 1 in "Corr. holiday" field not permitted; corrected to value 2.

Quick response would be of great help.

Thanks,

Madhurima.

4 REPLIES 4

AmlanBanerjee
Active Contributor
0 Kudos
247

Hi Madhurima,

If you want to use option 1-Use the workday following the non-workday, then in that scenario, you have switch on the dynamic scheduling (TE418-TS_DYN) against the MRU. 

Dynamic Scheduling has two options-

1-Dynamic scheduling, without budget billing amounts

2-Dynamic scheduling, with budget billing amounts

Depending on your Business requirement, you have to choose either one.

Hope it helps...

Thanks,

Amlan

0 Kudos
247

Hi Amlan,

I have done the required setting as you said.

I have made Dynamic scheduling active and in portion I have selected

1-Dynamic scheduling, without budget billing amounts. In MRU SAP has made the 'Non Working day' field as readable. Please let me know if any other setting is required.

Quick response would be of great help.

Thanks,

Madhurima.

0 Kudos
247

Hi,

Are you getting any error after you have switched on the Dynamic scheduling.

I would recommend you to perform a full cycle of testing before moving the changes to Prod.

Thanks,

Amlan

0 Kudos
247

Hi Amlan,

The basic problem is after making Dynamic Scheduling as active I am unable to do the following setting in MRU :

Correct Non Working Day - '1' stands for Use the workday following the non-workday.

The field Correct Non Working day is showing uneditable.

Thanks,