2012 Mar 01 10:43 AM
Hi experts,
Sometimes when i run the T-Code like EG01 then i see the message like "maintain system parameter table TE057"
What is this Message?
Kindly suggest me to solve this problem how can we maintain the these tables?
Regards.
Vaibhav
2012 Mar 01 11:04 AM
Hi Vaibhav,
Configuration need to done by the functional consultant.Once the configuration is complete , you won't get the mesaage while executing EG01.
Regards,
Chandan
2012 Mar 01 3:02 PM
thanks for reply.
i have done the config, but still having this problem.
kindly clear.
Regads.
vaibhav
2012 Mar 01 2:39 PM
Hi,
Table TE507 iis the configuration table for Basic Device Categories.
You should check with your Device Management configuration person to set these up.
Its possible the Device Category you are trying to create is attempting to use a Basic Device Category that is not configured.
Regards,
Ivor M.
2012 Mar 01 3:03 PM
Thanks for reply.
I have done all config, but still havng problem.
kindly suggest.
Regards.
vaibhav
2012 Mar 01 5:58 PM
Hi,
I assume by config you are referring to the following paths:
Define Sort Sequence for Basic Categs in Device Cat./Work List
and
Define Combination of Basic Device Categories
If not, please proceed by using the above config paths.
I hope this helps.
Regards,
Ivor M.
2012 Mar 02 6:03 AM
Very thank you Ivor M.
Pls tell me where we defined DIVISION in configuration part.
as in EG01 error msg is there " specify a valid division"
kindly suggest.
Regards.
Vaibhav
Edited by: sap975 on Mar 2, 2012 7:39 AM
2012 Mar 02 2:41 PM
Hi,
Diviisions are a high level Classification (e.g. Electricity, Water, Gas etc..) that shoud be set up first in Logistics General (Material Master) configuration.
If you are missing Divisions in your drop-down list in EG01, then you need to speak to your MM user or consultant and find out which Division they are using for their meters.
After the Divisions are set up in Material Master config, they have to be mapped to IS-U Division Category and Company Code in IS-Basic Settings ->Enterprose Structure configuration.
Regards,
Ivor M
2012 Mar 06 8:45 AM
Thanks for reply, I have some another queries
1: In our process Bills not generated if device replacement is done between actual meter reading date and scheduled billing date.
and for bill generation we reverse of device replacement and done again on a date other than scheduled billing date.
And now we want Device replacement should NOT BE ALLOWDED ON Sheduled billing date. how can we do this?
2: in device management we can enter one seal for a meter, now we want to use multiple seal for a meter because physical meter has multiple seals on site.
kindly suggest me how can we do this?
2012 Apr 11 7:39 AM
Hi Ankur,
Please see if below inputs help you or not.
Q1) Device replacement should NOT BE ALLOWDED ON Sheduled billing date.
There are device replacements reasons maintained in SPRO, check the below link:-
SAP Utilities--> Device Management--> Installation--> Basic Settings-->Define Reasons for Installation/Removal/Replacement- as I understand here are the permisions maintained like IR, RR, CR- replacement reason- Allowed or not. You can customize as per your requirement.
and also you can check the last node in the same SPRO setting
Define System Parameters for Installation/Removal/Replacement,
Q2) multiple seal for a meter
I think you have the seal code and seals generated already in system.
To assign multiple selas, you need to follow the steps as below:-
1) Issue the seal which is created in system with a unique combination of seal code and serial number.
2) Now allocate this seal with giving the equipment number, date of allocation, person responsible, and reason for allocation.
Repeat the same procedure for the second seal for the same equipment.
I hope this will help you out.
Regards
Sachin
2012 Jul 19 10:57 AM
Dear Sachin,
My question is this if schedule MRD and schedule billing date is 20.07.2012, and meter reading date is 21.07.2012
And user wants to replace the device on or before 21.07.2012, he should not be able to replace it.
Because if he does it we can not create the bill
Regards.
vaibhav
2013 Jul 05 6:10 AM
Hello,
Sorry for late reply!
You can maintain customized validation if user enters the replacement date before MRD then error or warning msg will be displayed.
Regards,
Priya