2015 May 05 8:07 AM
Dear gurus,
I'm trying use Dynamic period control and synthetics profile for estimating MR in Grid system.
I did configure DPC successfully however I didn't know which next step to estimate MR result with usage factor.
Please give me some advice
Thanks.
Message was edited by: William Eastman
2015 May 05 2:45 PM
Hi Tuan,
This would be a custom solution. SAP standard doesn't have any code for estimation of Meter reading based on usage factor.Its the other way round. Usage factor can be estimated from meter reading.
Hope this helps. 🙂
Cheers,
Rakesh..
sapisurdg.wordpress.com
2015 May 05 2:45 PM
Hi Tuan,
This would be a custom solution. SAP standard doesn't have any code for estimation of Meter reading based on usage factor.Its the other way round. Usage factor can be estimated from meter reading.
Hope this helps. 🙂
Cheers,
Rakesh..
sapisurdg.wordpress.com
2015 May 06 2:46 PM
Hi Rakesh
Thank for your information.
If SAP standard don't use usage factor for MR estimation, so what is the purpose of usage factor in Billing.
I read the link http://help.sap.com/saphelp_erp60_sp/helpdata/en/c6/e4bc3948d3ac55e10000000a114084/content.htm but not so clear how it work in billing.
Tks
2015 May 06 3:04 PM
Hi Tuan,
As is written down in the link you have shared, the usage factor will be used in forecasting(for settlement). It's not specifically used in Billing. You can however by checking the values in the synthetic profile and the usage factor estimate the future consumption but this would be manual , SAP doesn't have any code for this in Billing. Also if you go into the Load profile tab, there you could estimate the consumption which is based on the average of the past usage factors but again its consumption that is estimated and its to be done manually.
Hope this helps.
Cheers,
Rakesh..
sapisurdg.wordpress.com
2015 May 11 4:04 AM