SAP for Utilities Discussions
Connect with fellow SAP users to share best practices, troubleshoot challenges, and collaborate on building a sustainable energy future. Join the discussion.
cancel
Showing results for 
Search instead for 
Did you mean: 

How to identify prorration period at rate step level

0 Kudos
587

Hello to all,
I'm in a atypical situation, according to requirement when consuption cover a normal period I have to do calculation on monthly period basis but if I'm on a prorrated period like price changing or device replacement I have to do billing based on day period basis.
I've try using IF11, IF16 and IF17 variants but none of them do what I need.
Does anybody knows if this is posible?
Thanks in advance.

2 REPLIES 2

namitkgupta
Newcomer
0 Kudos
400

I know this a old post. But I thought of adding a solution option from my end.

You can put additional validations in the user exit EBIA0002  ( EXIT_SAPLEA00_001 ) for IS-U: Enhancement for External Proration dates and define your own proration.

0 Kudos
262

Hi namitkgupta, I hope you are doing well.

First of all, thanks for your answer, I was trying to probe if during the billing process, system stop at the exit, but although the module function is active and I wrote a break point it doesn't happen.

Do you know if I am missing something ?

Kind regards.

Moises.