2008 Dec 15 10:10 AM
Hi,
Could anybody please guide me how can we change the value in end of bill. per. date and allocation date in a portion.
Please guide.
Thanks and Regards
2008 Dec 15 1:54 PM
End of Billing Period: This is the date on which the portion is to be billed for the first time. This date together with the length of the billing period ( that is the period length), determines the date on the next billing ( start of next billing period = end of billing period + 1 day).
When the MRU is created the end of the meter reading period is automatically adjusted to correspond the end of billing period.
Please read the IUT 210 document. You will get more information
Regards,
Shiva Kumar
2008 Dec 15 1:54 PM
End of Billing Period: This is the date on which the portion is to be billed for the first time. This date together with the length of the billing period ( that is the period length), determines the date on the next billing ( start of next billing period = end of billing period + 1 day).
When the MRU is created the end of the meter reading period is automatically adjusted to correspond the end of billing period.
Please read the IUT 210 document. You will get more information
Regards,
Shiva Kumar
2008 Dec 16 5:06 AM
Hi,
Thanks for your valuable reply please.
Could you please give me a link for the IUT 210 document.
Actually what is happening we have one existing portion and existing mrus attached with that portion.
Now we need to change the end of billing per. date value and allocation date value, which system is not allowing us to do in the portion.
Could you please help us.
Thanks and Regards
Edited by: MPVash Vash on Dec 16, 2008 6:06 AM
Edited by: MPVash Vash on Dec 16, 2008 7:06 AM
Edited by: MPVash Vash on Dec 16, 2008 9:55 AM
Edited by: MPVash Vash on Dec 16, 2008 12:38 PM