SAP for Utilities Discussions
Connect with fellow SAP users to share best practices, troubleshoot challenges, and collaborate on building a sustainable energy future. Join the discussion.
cancel
Showing results for 
Search instead for 
Did you mean: 

Getting message Next replacement year 0000 for device 11112649 not permitted

0 Kudos
1,312

Hi All,

I am doing full installation using EG31 and getting message like "Next replacement year 0000 for device 11112649 not permitted" I checked the device and under cert/Per. Repl tab the next replacement year is 0

I checked the same in another system an it has been set to no replacement is required. Please let me know how/Where to set "No replacement required". I wanted to set no replacement required.

Regards,

1 ACCEPTED SOLUTION

daniel_mccollum
Active Contributor
633

If certification is not required, then you can set the device category details to avoid the need to ever require certification.

View solution in original post

4 REPLIES 4

monis_shakeel
Active Participant
633

You need to certify your device using transaction code EG97.

This should solve the problem.

You set the no certification/inspection while creating the device.

Regards,

Monis Shakeel

0 Kudos
633

HI Monis Shakeel,

Thanks for the reply. I am running the automation ( using ecatt). The certification using EG97 is not part of the automation. I am unable to get the second point that you have mentioned. You mean under the tab Cert/Per Repl tab during IQ01 ? Can you please let me know the steps.

Regards,

daniel_mccollum
Active Contributor
634

If certification is not required, then you can set the device category details to avoid the need to ever require certification.

0 Kudos
633

Hi Daniel McCollum,

Thanks. it worked.

regards