2011 Aug 01 9:44 PM
Hi All,
I am trying to extrapolate on the date 06/25/2008 based on the below given configuration I expect system to consider the periods between 05/27/2007 to 06/25/2007 for estimation but the system is taking the periods from 03/26/2007 to 06/25/2007.
In portion under Period characteristic Months = 1; Days = 0 and Factory calendar ID = Z9.
Minimum portion in the rate is 100%
Weighting procedure is degree day coefficients.
Base period category at installation is u201CPeriod of previous yearu201D
Degree day coefficient values are maintained for every day.
I am I missing something ?
Thanks,
VR
2011 Aug 02 5:05 AM
hi,
Do check if the base period is representative or not.
More info is here .
http://help.sap.com/erp2005_ehp_05/helpdata/en/f9/0b8a1810c511d289830000e828485b/frameset.htm
Cheers,
Rakesh..
2011 Aug 02 3:39 PM
Hi Rakesh,
I did went through this link and thats how I thought the base period should be calculated. But it my scenario its working differently.
thanks,
VR
2011 Aug 04 4:14 PM
Is your question why the date went back to March? The expected consumption calculation in SAP uses both the scheduled period from a year ago and the actual period from a year ago. If your question concerns a specific device, check the read history from the previous year to see if there were discrepancies around the March-May timeframe.