SAP for Utilities Discussions
Connect with fellow SAP users to share best practices, troubleshoot challenges, and collaborate on building a sustainable energy future. Join the discussion.
cancel
Showing results for 
Search instead for 
Did you mean: 

EA29- Mass processing bill Print out auto scheduling

Former Member
0 Kudos
955

Hi Experts,

I need a help regarding putting EA29- Mass processing bill Print out transaction in auto schedule in which DRUCKDAT-Print date field should be auto pick as current/system date.

As per below process, I tried with RFKK_MA_SCHEDULER functionality to auto schedule but it doesn’t work.

  1. 1) Create a Mass printing (transaction EA29) saved  parameters with current system date as date id and give any identification with last three digits as numeric. for example, date id = 30.10.2014., identification = MP0001.
  2. 2) Enter the general selections as required, Contract Account, Creation reason, tick mark of Document posted check box and enter the printing date = current system date (30.10.2014) in reprinting tab, and desired print parameters as Internet e-Mail in Tras.Method.
  3. 3) Then after I saved that Mass bill printout and not scheduled.
  4. 4) Create a copy and move new parameter records variant (transaction FPPARMV). Enter activity = BIPR, under 'Run identification' tab, enter the date id and identification as Step 1 (30.10.2014/MP001) in the frame 'Template'.
  5. 5) Under the frame 'Target', enter the date id = 30.10.2014, identification = TPR001.
  6. 6) Save this as a variant.
  7. 7) Create a new variant for mass activity (transaction FPSCHEDULER). Enter the mass activity type = BIPR, date id = 30.10.2014, identification = MP0001 (our template info from Step 1).
  8. 😎 Save this variant.
  9. 9) Now schedule the program RFKK_MA_SCHEDULER with the variant saved in Step 9.

Can you all please help on this? Where I have to make changes so that I can run EA29 in auto schedule and the field “DRUCKDAT”/ “Print date” will take system date automatically.

Regards,

Akhil Vaghasiya

3 REPLIES 3

Private_Member_7726
Active Contributor
0 Kudos
388

Hi,

I haven't used FPSCHEDULER/RFKK_MA_SCHEDULER so don't quote me on this, but you still would need to implement your own custom logic (the whole deal so to speak: reading, changing, saving a variant) under FQEVENT 1906 in order to manipulate the content of variant (rather than merely copy a variant under a new run Date ID), I believe.

cheers

Jānis

0 Kudos
388

Hi Janis,

thanks for reply. Late me try once with using event 1906 then I will revert back with whatever the outcomes.

Thanks,

Akhil

0 Kudos
388

Hi,

We use the job scheduler (FKJOXTR), along with the 190* events to handle mass activities.

Have you tried FKJOXTR?

cheers

Paul