2008 Jun 04 12:40 PM
Please, if somebody knows what it is the purpose of creating disconections documents with disconnection reasons TECH - technical disconnection and VACA - vacancy disconnection?
Kindest regards!
2008 Jun 09 3:39 PM
Hi Adrian,
VACA - vacancy disconnection --> this should be used, if nobody uses the installation. E.G. the last customer moved out and you want to ensure that NO BODY can use energy/water/... of this flat (e.g. to prevent vagrancy in the usage of energy)
TECH - well, just disconnect the installation/device/... because the whole powerline was cut or something like that. You could probably use that, if after such a very hard brakedown you don't want customers just use energy uncontroled - you "switch" each meter to ON one after another - controlled by this disconnection/reconnection.
That's just some idea - if you need more, just as any SAP sales person
KR
Uwe
2008 Jun 09 3:39 PM
Hi Adrian,
VACA - vacancy disconnection --> this should be used, if nobody uses the installation. E.G. the last customer moved out and you want to ensure that NO BODY can use energy/water/... of this flat (e.g. to prevent vagrancy in the usage of energy)
TECH - well, just disconnect the installation/device/... because the whole powerline was cut or something like that. You could probably use that, if after such a very hard brakedown you don't want customers just use energy uncontroled - you "switch" each meter to ON one after another - controlled by this disconnection/reconnection.
That's just some idea - if you need more, just as any SAP sales person
KR
Uwe
2008 Jun 10 7:20 AM