2021 Mar 09 1:43 AM
We receive meters in Sloc A , after inspection moves them to Sloc B, and then issue for work orders.
Recently for some of the GR receipts, MMBE shows all the meters in Sloc B but the serial number list and Serial number history shows those meters in Slock A in ESTO.
Please advise where to check and how to reconcile.
Thank you
2021 Mar 17 6:50 PM