SAP for Utilities Discussions
Connect with fellow SAP users to share best practices, troubleshoot challenges, and collaborate on building a sustainable energy future. Join the discussion.
cancel
Showing results for 
Search instead for 
Did you mean: 

device exchange when a future Move-in/move-outs is premeditated

Former Member
0 Kudos
218

Hello,

we have a lot of future move-outs/move-ins up to the year 2024. This can cause several problems, e.g.: when the device has to be changed. As the move-in induces a meterreading value the device cannot be removed without taking back the move-in/move-out. This o the other hand leads to problems with data exchange. Is there any possibility to keep the future move-out/move-in on hold in order to prevent the necessity to roll back the whole process?

Best regards

Sabine Udet

1 REPLY 1

TammyPowlas
Active Contributor
0 Kudos
125

Hi Sabine - there are several notes on this topic; I recommend searching for them at support.sap.com/notes - here is one interesting SAP Note: https://launchpad.support.sap.com/#/notes/2414423