Hi Experts,
we are looking foe experts opinion on data update into SAP ISU replicating to CRM system.
To Brief the requirement need to update the 6 million existing ISU Connections objects address data in SAP and the same data need to Replicate the CRM system.
To acheive the same desgning the Z-BDC program and uploading data through files with 5000 recods per set.
with each set of 5000 records time taken was app 4000.secs while schedule in back ground.
8
Tested with 20 sets scheduling 20 jobs in BG and it has taken 3500 sec to 8000 secs
Over all completion of 1 lakh with 20 sets is approximately 8000 secs including repliacting to CRM in this case 20*60*8000 seconds
How much load can be put at time in back ground through our z program, performace constraints.
Need suggestion is there any other way that can be done in less time for updating data in ECC and the same need to replicated system.
Thanks in advance.
Siva
2013 Dec 10 8:54 AM
2013 Dec 10 1:47 PM
2013 Dec 10 2:24 PM
Thanks william
as we are updating only four fields of CO tried with BDC not explred EMIGALL.
And I got few suggestions that for EMIGALL providing input file is difficullt and links that I can explore to analyze furthur.
Thanks
Siva B