2011 Jun 20 4:55 PM
Hi,
Does any one have any idea about the concept of " cooling off process" in SAP ISU. Are there any whitepapers/documents avaliable for the same here?
2011 Aug 17 12:52 PM
Hi,
There is a concept of cooling down procedure in Utility industries. The concept is:
After move in, if the customer wants to move out or change the opted product within a specified period of time(for e.g. 15 days) then there will be no charge/penalty for that.
Regards,
S