SAP for Utilities Discussions
Connect with fellow SAP users to share best practices, troubleshoot challenges, and collaborate on building a sustainable energy future. Join the discussion.
cancel
Showing results for 
Search instead for 
Did you mean: 

contract creation

Former Member
0 Kudos
2,251

hi all

ES20 allows us to create a new contract other than creating a contract through movei,in the last tab of installation in that particular tcodes screen ,i dnt find the filed for entering the installtion for which i need to assign this contract,i suddenly found it disapper,i am sure that i ssigend a contract account and a installation for creating ancontract in ES20.

let me know how to make this installation field appear again...

kr

raj

1 ACCEPTED SOLUTION

Former Member
0 Kudos
914

ES20 is used to create contracts but you cannot use it to link to an installation, nor you can use this contract for billing (automatica and manual).

Contracts created with ES20 are used only to post FICA items.

Daniel Toba

http://www.sap-isu.net - SAP ISU social network

View solution in original post

6 REPLIES 6

Former Member
0 Kudos
915

ES20 is used to create contracts but you cannot use it to link to an installation, nor you can use this contract for billing (automatica and manual).

Contracts created with ES20 are used only to post FICA items.

Daniel Toba

http://www.sap-isu.net - SAP ISU social network

Former Member
0 Kudos
914

Hi Varadha,

The correct process for creating a contract is to create a Move In Document (EC50E) first and it will create a Contract automatically.

Regards,

Manish

0 Kudos
914

Hi, what about caa1

rgds

saj

0 Kudos
914

Business Agreement will be replicated as Contract Account in IS-U.

CAA1 is the t-code to create a contract account.

Regards,

Siva

Former Member
0 Kudos
914

Hi,

You need to follow these steps to create a contract:

1).Create the Business master data i.e. Business Partner(FPP1) & Contract Account(CAA1) linked to BP.

2). Create Technical Master Data i.e. Connection Object(ES55).

3). Create Premise(ES60) linking the above created Connection object to it.

4). Create Installation(ES60) linking the above created Premise to it.

5) Do the Move-In(EC50E), CONTRACT WOULD BE CREATED AT THE TIME OF MOVE-IN AUTOMATICALLY.

Thanks,

Abhishek

0 Kudos
914

This message was moderated.