‎2010 Nov 25 9:30 PM
Hi Experts,
How will be changed Date identification in FPSCHEDULER when I will plan FPOP in FPSCHEDULER as a job?
It's possible to plan it with FKJOXTR(because FPSCHEDULER is signed as obsolete ) ? If yes how?
What is the best way run FPOP on periodic basis ?
thanks in advance.
jb
‎2011 Jan 29 6:48 AM
FPSCHEDULER still active and it works fine. It picks up from the system date automatically then copies all the parameters from the template that was executed or saved before.
Ram
‎2011 Jan 31 1:58 PM
Hello Ram,
thanks for answer, we have still problem with FPSCHEDULER.
could please describe step by step what should be done to run FPSCHEDULER as a job? We are using mass activity type BWOP.
thanks in advance.
jb