BW Mass activity BWOP / transaction FPOP 2.

jan_balek
Explorer
0 Kudos
247

Hi Experts,

How will be changed Date identification in FPSCHEDULER when I will plan FPOP in FPSCHEDULER as a job?

It's possible to plan it with FKJOXTR(because FPSCHEDULER is signed as obsolete ) ? If yes how?

What is the best way run FPOP on periodic basis ?

thanks in advance.

jb

2 REPLIES 2

Former Member
0 Kudos
126

FPSCHEDULER still active and it works fine. It picks up from the system date automatically then copies all the parameters from the template that was executed or saved before.

Ram

0 Kudos
126

Hello Ram,

thanks for answer, we have still problem with FPSCHEDULER.

could please describe step by step what should be done to run FPSCHEDULER as a job? We are using mass activity type BWOP.

thanks in advance.

jb