2017 Dec 07 5:04 PM
We have a scenario, legacy meter is replaced with a smart meter in between the billing period. Demand is also one of the billing components. During billing for the period having a meter replacement, Max demand need to be determined between the meters of different nature and the determined max demand value need to be billed for entire month. Do we have a standard variant program to handle this scenario ? Please let me know. Thanks.