SAP for Utilities Discussions
Connect with fellow SAP users to share best practices, troubleshoot challenges, and collaborate on building a sustainable energy future. Join the discussion.
cancel
Showing results for 
Search instead for 
Did you mean: 

Bill max demand value for the period with meter replacement (legacy to smart meter)

Former Member
0 Kudos
372

We have a scenario, legacy meter is replaced with a smart meter in between the billing period. Demand is also one of the billing components. During billing for the period having a meter replacement, Max demand need to be determined between the meters of different nature and the determined max demand value need to be billed for entire month. Do we have a standard variant program to handle this scenario ? Please let me know. Thanks.

2 REPLIES 2

ricky_shaw
Contributor
0 Kudos
148

Can you please share your solution here?

ricky_shaw
Contributor
0 Kudos
148

No One answered this.