2009 May 04 1:17 PM
Hello,
When I proceed to the billing of installation wich I change his meter readin unit, the billing document take the old meter reading unit, although it is the new MRU manages the billing period.
N.B: I handled the new MRU (EL40)
2009 May 04 3:11 PM
Hi,
The Billing document taking old MRU because there would be a Meter Reading with this MRU. Go to ES32 and check the Billing order or Meter Read Results If Old Meter readings are there then Reverse them Thru EL37. do Meter reading from the new MRU assignment date and then do billing.
With Regards,
Sunil
2009 May 04 3:57 PM