Bill doc with the wrong meter reading unit

Former Member
0 Kudos
197

Hello,

When I proceed to the billing of installation wich I change his meter readin unit, the billing document take the old meter reading unit, although it is the new MRU manages the billing period.

N.B: I handled the new MRU (EL40)

2 REPLIES 2

Former Member
0 Kudos
146

Hi,

The Billing document taking old MRU because there would be a Meter Reading with this MRU. Go to ES32 and check the Billing order or Meter Read Results If Old Meter readings are there then Reverse them Thru EL37. do Meter reading from the new MRU assignment date and then do billing.

With Regards,

Sunil

0 Kudos
146

Hi,

I already check, all meter reading orders are deleted with EL37.