SAP for Utilities Discussions
Connect with fellow SAP users to share best practices, troubleshoot challenges, and collaborate on building a sustainable energy future. Join the discussion.
cancel
Showing results for 
Search instead for 
Did you mean: 

Recent Activity

Integrating Workorder in CIC screen?

Hello,1. I would like to integrate the Workorders in the CICO Screen. Where it should be done? In Action box? 2. Following are the work orders need to be used.- Field Verification - Meter Removal- Meter Installation- Disconnection- Reconnection- Mete...

Resolved! send profiles (edm)

hi friends in help.sap its given in edm that we can send profiles in utilitiesedm-send profiles..but id nt find eiter in spro or in easy access .i would like to know the tcode of that path if any 1 has got it..am using ecc6.i hope it m...

Rate Change - Block

Hi, If the customer is on a Rate Category AAA and due to his heavy usage automatically switch to Rate BBB, now the requirement is that if this happens, the customer should be blocked automatically from switching back over to Rate category AAA again....

FPP1 / XDO2 / BP Relation

Hi Experts..I created a BP through FPP1 , but iam not getting this BP in XD02(SD).so can any one explain complete customaization from spro.. i allocated ref customer in customization...but its not effecting..plz explain me complete process to get th...

EDM profile allocation

hi friends in edm while performing profile allocation am facing a problemin profile allocation step we need to specify the register which has the interval length identical to that of the profiles interval legth.my interval length both ...

Resolved! SAP in Power sector

Hi, This is Rama Murthy.P I am an ABAP consultant, I did my masters in Electrical Engineering. Please tell me wether is any scope for SAP in Power sector if yes. What are the prerequisits, I mean what preliminary knowledge must one have to become a...

Resolved! Work Order?

Hello,The client requirement is to generate work order for some cases such as field verification, Meter removal, meter installation, disconnection, reconnection and so on.I would like to know the following.1. Whether these work orders should come in ...

Resolved! EDM profile header

hi friends i have got an issue in profile creation in edmwhen i tried to create profile header t code eedm06 i selected the interval length as price but its asking for unit of measurement..actually it must ask only for currency..but it...

Resolved! edm

hi friends prince here..i have got a query with profile allocation in edmkindly help methe query is as followswhen i trued to allocate the profile header in profile allocation its displaying en error*You tried to allocate profile 10002 w...

Resolved! G/L account Changed after Move In...

Dear Gurus,I had done a Move In and raised an invoice for a BP. Afterwards I had to delete the GL a/c number of Invoice Receivable a/c and assign a new G/L number.Now the invoicing cannot be reversed. It shows the Error message that Old G/L a/c does ...

EDM

hi friends prince here..can any one help me out for this issue in EDM.am in the customising phase of edm.in the mean time i tried creating a profileso i i accessed t code eedm06 and it required certain mandatory fields and i tried m...

Top kudoed authors
Top Kudoed Posts