2010 Oct 14 11:30 AM
Hi,
in my grant, I assign budget to grant an d the system calculates the indirect costs.
My opinion is that the indirect cost have to be assigned to internal fund but the system assign the indirect cost to external found.
In this way, I cannot use the internal fund for posting some document because the availability control give me an error.
In which way I can customizing the system? I want the direct budget assigned to external fund and the indirect cost assigned to internal fund
thanks
Regards
2010 Oct 26 10:30 AM