2012 May 15 8:10 AM
Hi People,
We have a requirement to check budget availability at the time of Material Reservation.
The scenario is that when some material is required to be consumed through Plant and Maintenance, the responsible person
will first create the create the PM order (breakdown or maintenance). Then against this PM Order a reservation will get created
once the order is released.
So the requirement is that while creating the reservation itself the system should check the budget availability and then stop / allow
the user to create the reservation. Else even if the budget is exceeded the system will allow the user to keep creating reservations.
Any help or input in this regard will be useful to us.
Regards,
Dhruv
2012 May 15 8:27 AM
Hi,
It's possible as of release 6.03. Please, read notes 1321375 and 1278967.
Regards,
Eli
2012 May 15 8:27 AM
Hi,
It's possible as of release 6.03. Please, read notes 1321375 and 1278967.
Regards,
Eli
2012 May 16 12:14 PM
Hi Eli,
Thanks for your valuable inputs. You surely are "Lender at the Last Resort".
Regards,
Dhruv