2009 Sep 22 12:59 AM
Hi all,
We are working on former budgeting in ECC 6.0, every setting for AVC have been completed, including condition u201CAlways checku201D in u201CMaintain Availability Controlu201D.
We would like that the AVC executes in every activity of the document chain.
e.g.: If we have a PR for 1,000 USD, when we are creating a PO for that PR, we need to check the budget only on that predecessor PR document.
Desired scenario
PR for USD 1,000
The available budget is USD 5,000
The user tries to create a PO for USD 1,200 with reference to that PR
The system should issue an error message saying that there is an exceeding amount for USD 200
Thanks in advance,
Adriana
2009 Sep 22 8:32 AM
Hi Adriana,
This requirement has nothing to do with FM. FM checks availability on budget and not on the documents. You can consult your MM consultant to lock the possibility of opening PO on the bigger amount than PR. FM-AVC (former or BCS - does not matter) will check against 5,000 in your case; so with the PO in the sample the overall consumption would be 1,200 (still 3,800 available budget left).
Regards,
Eli
2009 Sep 22 8:32 AM
Hi Adriana,
This requirement has nothing to do with FM. FM checks availability on budget and not on the documents. You can consult your MM consultant to lock the possibility of opening PO on the bigger amount than PR. FM-AVC (former or BCS - does not matter) will check against 5,000 in your case; so with the PO in the sample the overall consumption would be 1,200 (still 3,800 available budget left).
Regards,
Eli
2009 Sep 22 3:52 PM
Hi Adriana, as for EhP4 you can customize the tolerance checks in PSM-FM under: Integration Materials Management -> Tolerances Between Documents. Formely this was available under US Federal Government "Document-to-Document Tolerances".
Regards
César
2009 Sep 22 4:21 PM
2009 Sep 22 11:41 PM