2015 Oct 01 8:18 PM
Before dealing with sub-items, please let me know how would a regular nomination look like to transfer material from one TS (intransit plant A) into another TS (intransit plant B), having a commom location LOC.
Now a more complicated scenario. How do I transfer material from one TS to another using sub-items?
The business scenario is:
- purchased material is received and loaded into barges
- barges go up to a location
- at this location material is transferred to trucks
- trucks go into plant and material is transferred into stock.
Since Modes of Transport are different, I need a TS for the river and another TS for the trucks.
Barges and trucks will be nomination sub-items. How will the nomination look like (which line items)?
2015 Oct 05 10:57 AM
Hello Jose Vargas,
For this scenario you would need to create two nominations. One to load the material into TS1 and unload at a location. Another nomination to load into TS2.
For subitem scenario.
Nomination 1.
Line item 1 O - P ( Purchase into transport system ) with subitems which represent the barges.
Line item 2 D - X ( unload at the location ) with subitems
Nomination 2 .
Line item 1 O-X ( Transfer into transport system 2 ) with subitems which represents trucks
Line item 2 D-X ( Unloading at the plant ) with subitems.
Regards,
Christina.
.
2015 Oct 05 10:57 AM
Hello Jose Vargas,
For this scenario you would need to create two nominations. One to load the material into TS1 and unload at a location. Another nomination to load into TS2.
For subitem scenario.
Nomination 1.
Line item 1 O - P ( Purchase into transport system ) with subitems which represent the barges.
Line item 2 D - X ( unload at the location ) with subitems
Nomination 2 .
Line item 1 O-X ( Transfer into transport system 2 ) with subitems which represents trucks
Line item 2 D-X ( Unloading at the plant ) with subitems.
Regards,
Christina.
.
2015 Oct 05 2:51 PM
Thanks Christina!
Let me ask you another question.
I'll peg items 1 and 2 from nomination 1, and 1 and 2 from nomination 2, so I can check if all that was loaded was discharged. But how do I actually make this check?
I'll also peg item 2 from nomination 1 with item 1 from nomination 2, to check that it was all transferred. But again, how/when do I make this check?