Laytime and Demurrange Calculations

Former Member
0 Kudos
308

HI

If Freight contract is set up with Lay Terms and Demurrange conditions maintained in the freight contract and Nomination is created referring the freight contract, can we see the Laytime and Demurrage in the nomination based on the scheduled quantities before actual events are recorded?

Where in the Nomination (which tab at header/item level) is this visible?

Sriram

1 ACCEPTED SOLUTION

Naresh_Jangam
Product and Topic Expert
Product and Topic Expert
0 Kudos
147

Dear Sriram,

O4NM >> Nomination >>  Goto >> header >> Laytime calculation , in the same way  item >> Laytime calculation is the path to view the details.

Thanks,

Naresh.

View solution in original post

1 REPLY 1

Naresh_Jangam
Product and Topic Expert
Product and Topic Expert
0 Kudos
148

Dear Sriram,

O4NM >> Nomination >>  Goto >> header >> Laytime calculation , in the same way  item >> Laytime calculation is the path to view the details.

Thanks,

Naresh.