SAP for Oil, Gas, and Energy Discussions
Connect with fellow SAP users to share best practices, troubleshoot challenges, and navigate the evolving energy landscape. Join the conversation today!
cancel
Showing results for 
Search instead for 
Did you mean: 

How and where to define movement type for O4G1 or O4H1

Former Member
0 Kudos
1,333

Hello.

When Loading confirm(O4G1) and Delivery confirm(O4H1), some movement types create.

For example,

After Loading confirm 311->647->101.

After Delivery confirm 309.

How and where to define movement type for O4G1 or O4H1.

Please, answer to me.

Good day~!

1 ACCEPTED SOLUTION

ipejohn_jerin
Product and Topic Expert
Product and Topic Expert
0 Kudos
506

Hello ,

Try to maintain movement type in the customizing for the intransit group that is assigned to the bulk shipment type.

Regards ,

Jerin Ipe John .

View solution in original post

5 REPLIES 5

ipejohn_jerin
Product and Topic Expert
Product and Topic Expert
0 Kudos
507

Hello ,

Try to maintain movement type in the customizing for the intransit group that is assigned to the bulk shipment type.

Regards ,

Jerin Ipe John .

Former Member
0 Kudos
506

Hi

Try to maintain movement type in the customizing for the intransit group that is assigned to the bulk shipment type.

Regards ,

Former Member
0 Kudos
506

Hi Bulk shipment type and intransit posting group will determine the Movement type.

For Define bulk shipment type ;

SPRO => Industry Solution Oil & Gas (Downstream)=>TD (Transportation and Distribution) =>TD Bulk Shipment => Define bulk shipment type

For Define intransit posting group :

SPRO => Industry Solution Oil & Gas (Downstream)=>TD (Transportation and Distribution) =>TD Bulk Shipment =>Intransit Stock =>Define intransit posting group.

0 Kudos
506

Hi ,

you can also influence the Mvt by other means in some cases e.g. you can post a transfer movement triggered by a sales order, which is sometimes helpful.

You use the standard config of Order type, Item category, Schedule item category -> special Mvt.

This is not config only a few lines of code are required in a MV45 exit.

Cheers ML

Former Member
0 Kudos
506

Hi,

In load confirmation and delivery confirmation. it will take a movement type (generally 311 and 641 for pgi and 101 for GR) which is maintained in intransit posting group. During these transaction. system check the shipment type from shipment type it will go to intransit posting group and from that intransit posting group it and shipment type it will pick up the movement type and post the document

Regards

Pravin