IS/M-SD Integration with PP

Former Member
0 Kudos
118

Hey experts,

Are there standard integration points between IS/M-SD and SAP PP?

My client is a Newspaper publishing company who want to implement SAP PP to manage their plant's capacities, procurement planning and record production.

If there are no standard integration points available, is it possible to integrate the two?

Best Regards

  • SAP Managed Tags:
2 REPLIES 2

Former Member
0 Kudos
63

Hi,

In standard SAP there is no such integration.For the production planning you have to use third party softwares like DENEX InfoTrack Production information system for printing plants

DENEX ProdPlan - gives you detailed production planning

DENEX InfoTrack provides an open system

for integration with other systems

-->MS SQL Server database

-->Internet & Intranet options using standard browsers

-->IFRAtrack and CIP3 compliant

-->Easy to interface with any press and postpress equipment

-->Expandable from single press/single site to multipresses/multisites

Brief:

DENEX InfoTrack

The information system for Commercial and Newspaper production.From Pagemaking to Distribution.

DENEX ReelTrack

Total paper information system from order to consumption

DENEX ReelTrack provides complete control

of the paper supply

--> Complete roll inventory control

--> Consumption per product

-->Collects reelroom waste values

-->Multiuser/Multistorage operations

-->EDI/E-mail communication with mills and warehouses

-->Multiple paper owners

-->In transit monitoring

DENEX CopyTrack

Monitors production flow from prepress to distribution

  • SAP Managed Tags:

Former Member
0 Kudos
63

Hi,

You can use the Media Issues (material master) to integrate MSD with PP. You can use the MRP1, MRP2 & MRP3 and Work scheduling views in the material master and maintain the credentials . The important values as shown below can be maintained in the media issue template. While generating the media issues for each publication date, those values will be copied to media issue.

In MRP1

Base UOM

MRP Type

MRP Controller

Lot Size

Assembly Scrap

MRP2

Procurement Type

Production Storage Location.

Schedule Margin Key

MRP3

Forecast Requirements

Availability check

Work Scheduling

Base Unit Of Measure

Prod. Schd. Prof

Prod. Storage. Loc.

Overdely. tol

Regards,

Suresh K.K.

  • SAP Managed Tags: