| Subject | Author | Likes | Latest Post | Replies | |
|---|---|---|---|---|---|
|
Dears, Our company is in S4/H environment and now we have a problem with MRP and ATP. Counld anyon...
| 0 | 4 | |||
|
This is an intercompany sales scenario in which orders are placed from field locations to manufactu...
| 0 | 4 | |||
|
Application F0266A (Delayed Production Orders - MRP) displays redundant data. A production order i...
| 0 | 0 | |||
|
The demand generated from the sales order, after running MRP, is allocated and linked to the sales ...
| 0 | 1 | |||
|
Dear Gurus, While setting up MRP and the most relevant Fiori apps, I have come across an issue rel...
| 0 | 2 | |||
|
Hi, I have a scenario with 2 MRP areas, one is a storage location MRP area (Area type 02) and the ...
| 0 | 0 | |||
|
Hello Experts, I am working on SAP S/4HANA Cloud Public Edition, and I found an inconsistency betw...
| 0 | 2 | |||
|
Dear Expert, I am testing a scenario with PP strategy = Planning w/o Final Assembly at Assembly L...
| 0 | 2 | |||
|
Dear Community, We created a rework production order to rework a material 150A to 150B. The mater...
| 0 | 2 | |||
|
Hello experts, I’m working on a Make-to-Order (MTO) process in SAP S/4HANA where a production or...
| 0 | 2 | |||
|
Hi Exper! The Purchase Requisition created by running MRP is converted into a Purchase Order using...
| 0 | 2 | |||
|
Hi Team, We are currently using transaction code MD01N for MRP execution. During this process, the...
| 0 | 3 | |||
|
Hello Experts, I need some guidance on the following requirement from our client. In our current ...
| 0 | 2 | |||
|
Hello Experts, I am working in PP-PI with a 2-level production structure: Finished Goods (FG) a...
| 0 | 4 | |||
|
Hi experts, I have an requirement to create 1 schedule line (for external procured items with sch ...
| 0 | 3 | |||
|
There are no run in background function in this tcode. MDBT only support plant level planning. The...
| 0 | 1 | |||
|
The business wants us to create planned orders separately for each sales order requirement, even th...
| 0 | 5 | |||
|
Hi, We are running MD01 with the following parameters Processing key: NETCH Create Preq: 2 SA D...
| 0 | 2 | |||
|
Scenario - I have a BOM in plant X for material H123 which has a component G123. The component G12...
| 0 | 5 | |||
|
Hi, The question is related to Traffic light in MD04 or MD07. I have the following picture. Curre...
| 0 | 4 | |||
|
I have a question, why MRP run generated the planned orders which did not cover the date of the req...
| 0 | 2 | |||
|
Hey Guys, we are facing some confusing calculations inside MRP Run so we are using WB weekly lo...
| 0 | 0 | |||
|
How to configure the setting so raw material PR is generated by production order? And below is the...
| 0 | 0 | |||
|
Hello everyone, My company is making the transition to S4H (rise), we are in the test phase and th...
| 0 | 4 | |||
|
Hello, how is it possible to delete the MRP data of the ORCM table for removed scenarios? I creat...
| 0 | 1 | |||
|
Hi Experts, Business wants to plan a specific Seasonal product only for 3 Months with MRP consider...
| 0 | 0 | |||
|
Hi How can the person in charge recognize MRP failures? A “failed” status exists in Schedule M...
| 0 | 3 | |||
|
Hi, I needed to setup regular job for forecast execution. Program RMPROG00. It should be run once ...
| 0 | 1 | |||
|
Hi, My requirements is to setup maxim stock limit for purchased materials. For example: Max stock...
| 0 | 0 | |||
|
Hi Expert! I want to run MRP on an MRP Controller basis set in the MRP area. ・Three MRP(Z1510, Z1...
| 0 | 3 |