In SAP Business ByDesign (SAP ByD), during production confirmation, the system typically uses the Bill of Materials (BOM) assigned to the Product Model to determine the quantity of input components via backflush. If users are able to manually change the input component quantity (e.g., setting it to 0) and still confirm the production task, that is a process/control issue — especially if it should be restricted to ensure BOM accuracy and material traceability.