cancel
Showing results for 
Search instead for 
Did you mean: 

Update asset while changing the operation status of Work Order IW32

former_member576555
Discoverer
0 Kudos
250

Hi,

I am trying to update an asset under a functional location based on the work order operation status in IW32.

i.e.., When I am trying to change the operation status to completed the requirement is to add new asset under the functional location of the same operation and also update the operation with the new asset. The updation should take place after all the required validation. Can you please suggest?

Thanks,

Anand.

Accepted Solutions (0)

Answers (0)