cancel
Showing results for 
Search instead for 
Did you mean: 

Trigger PS Project from a Maintenance Service order in S/4HANA 2022

joeformosa
Newcomer
0 Kudos
248

Is the above available like in the Sales Order process?

In PS, CN08 is used to tie in the Network to a Material Number.

If this is not available, when will it be incorporated as a function.

Thanks

Joseph Formosa

Accepted Solutions (0)

Answers (0)