cancel
Showing results for 
Search instead for 
Did you mean: 

Transport project and configuration

nwalter1
Explorer
390

Hi,

we would like to achive the following two goals:

  • Transport MII configurations from DEV > QUALITY > PROD
  • Transport MII projects from DEV > QUALITY > PROD

I read through a lot of old blog posts and questions asked here. Since they are very old and sometimes links don't work I wanted to ask again how to achive the top two goals?

Do I only need CTS+ or do I also need NWDI? What else do I need beside at least two MII systems?

What are the newest and actuals guides to use?

Thanks!

Accepted Solutions (0)

Answers (1)

Answers (1)

kenantelyakar
Explorer
0 Kudos

Hi Nico,

If you want to transport configurations, you have to configure CTS+. You can transport MII configurations with STMS requests in SAP ERP. You can check this document about your first goal:

https://www.sap.com/documents/2017/02/e2d92c67-a67c-0010-82c7-eda71af511fa.html

About your second goal, you should use NWDI system (local or remote) with CMS,CBS components which has full source control about workbench files. If you have questions about NWDI system configurations, I can send you a document about that.