on 2020 Dec 14 2:54 PM
Hi,
We are configuring an OEE project in a SAP MII-OEE 15.3 SP01 system. I'm trying to create plant reason codes for type scheduled downtimes and changeover. In SAP Help there is a phrase:
"You can maintain the planned (standard) duration for scheduled downtime and changeover with a particular reason code. For this, you maintain the standard duration in minutes for reason codes that belong to data elements of type scheduled downtime (SCHD_DOWN) and changeover (CHANGEOVER).
If the standard duration maintained is set as Is Fixed, then this duration cannot be modified by operators when reporting a downtime. If it is not set as fixed, the operators have the flexibility to modify the standard duration when reporting the downtime."
This is the help link:
However when i look at the system, i can not find /see the standard duration field in /OEE/PLANT_RC transaction code. I configured global reason codes leveI 1-2-3 and plant reason codes level 4. I attached the reason codes i configured in global reason codes and the reason codes i defined as master data in plant reason codes. Can you help me please?
global-reason-codes-for-changeover-and-sched-down.png
plant-reason-code-for-sched-down-type.png
Thank you.
Are you able to find solution ?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Yes, SAP answered our ticket and they added a new t-code which is /OEE/RC_PLANT (previously /OEE/PLANT_RC) and this new t-code includes standard duration and fixed field. You can see them in the attached screenshots.oee-rc-plant-1.pngoee-rc-plant-2.png
Hope this helps.
User | Count |
---|---|
2 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.